Innovation Nigeria

Top Menu

Main Menu

  • Home
  • About us
  • Contact Us
Sign in / Join

Login

Welcome! Login in to your account
Lost your password?

Lost Password

Back to login

logo

Innovation Nigeria

  • Home
  • About us
  • Contact Us
  • ITU Bolstering Nigeria’s Digital Transformation – Danbatta

  • WCRD 2022: NCC sets up TELCARE Desk & Assures strong digital infrastructure for improved financial services

  • How NASENI Technologies Can Promote Economic Growth & Development in 36 States of Nigeria

  • NASENI & INDONESIA REVIVE COLLABORATION ON TECHNOLOGY TRANSFER TO NIGERIA

EngineeringIndustryInnovationScienceTechnology
Home›Engineering›Establishment of NASENI First Class Transformer Plant In Nigeria Underway.

Establishment of NASENI First Class Transformer Plant In Nigeria Underway.

By Sam Ogbeifun
August 19, 2022
467
0
Share:
Share:

.Vice President, IT Electronics Eleventh Design and Research Institute, Ge Jun (L); Executive Vice Chairman, National Agency for Science and Engineering Infrastructure (NASENI), Prof. Mohammed Haruna, (1st, R)Vice Chancellor, University of Port Harcourt, Prof. Owunari Georgewill (R) and others inspecting the prototype of NASENI-CGWIC Solar Cell Production Line Project, during the visit of the delegation of China Great Wall Industry Incorporation to NASENI headquarters in Abuja on Thursday (18/8/22).inspecting the prototype of NASENI-CGWIC Solar Cell Production Line Project, during the visit of the delegation of China Great Wall Industry Incorporation to NASENI headquarters in Abuja on Thursday (18/8/22).

…As PRESIDENT BUHARI Directs September,2022 As Date for Plant Ground Breaking/Foundation Laying. Said Prof Haruna

In line with its Industrialization Agenda through economic diversification by the Federal Government, the National Agency for Science and Engineering Infrastructure (NASENI) and China Great Wall Industry Corporation (CGWIC) will next Month(September,2022) carry out the ground-breaking and foundation laying ceremony towards establishment of a first Class Transformer Production Plant in Nigeria. (This is the first of its kind in Nigeria and second in Africa)

A visit to Nigeria, followed up with official meeting with the management of NASENI by the Chinese team took place today in Abuja with the Executive Vice Chairman/Chief Executive of NASENI, Engr. Prof. Mohammed Sani Haruna on ground to receive the Chinese technical partner at the NASENI corporate headquarters. The visit was aimed at putting finishing touches in preparation for meeting September 2022 deadline for the commencement of work on the project as directed by President Muhammadu Buhari, who doubles as the Chairman of the Governing Board of the Agency.

The leader of the delegation and Chairman Chinese Liaoning Huaye Group Development Ltd, Anshan, Ma Liming disclosed during the working visit to NASENI that Nigeria and China had a long lasting relationship which led to the signing of the agreement on building of the first transformer manufacturing plant in Nigeria, adding that, the partnership also resulted in the training of Sixty (60) NASENI Engineers on Transformer Production Line and High voltage Testing Laboratory Plant. The third component of the project is the establishment of a solar cell manufacturing plant in Nigeria aimed at popularizing renewable energy in the country.

According to him “NASENI and China would continue to work together to ensure the attainment of the  industrialization agenda of the Federal Republic  of Nigeria which the three projects have as targets to be kick-started with the building of a first class Transformer Plant in Africa to be located in Nigeria.

“We will work together as good partners to ensure that Nigeria has the best transformer plant in Africa, he said.

In his welcome address, Engr. Prof. Mohammed Sani Haruna who conceived the ideas of the projects went down memory lane on the relationship between NASENI and China which culminated into the establishment of the transformer plant in Nigeria. He said the agreement was first signed in 2013 between the Federal Government and People’s Republic of China, but due to some technicalities, the project could not take off.

He disclosed that President Muhammadu Buhari had given a fresh directive concerning the three projects which, according to him, must take off next month (September 2022).

He also disclosed that more than 50% of the 15 percent counterpart fund to be paid by the Federal Government on the establishment of transformer plant in Nigeria has been fulfilled and the ground-breaking and foundation laying ceremony of the project will be done by Mr. President in September,2022. He said this particular round of visit by the Chinese technical partner to Nigeria was to ensure that all the finishing touches on the commencement of construction work about the projects are done with for effective take-off in September.

From left: Chairman, Liaoning Huaye Group Development Ltd in China, Ma Liming; Executive Vice Chairman, National Agency for Science and Engineering Infrastructure (NASENI), Prof. Mohammed Haruna; Deputy General Manager, China Great Wall Industry Incorporation, Qi Suolong; Coordinating Director, Planning and Business Development, NASENI, Mrs Nonyem Onyechi; Vice President, IT Electronics Eleventh Design and Research Institute, Ge Jun; Vice Chancellor, University of Port Harcourt, Prof. George Owunari, and others during the visit of the delegation of China Great Wall Industry Incorporation to NASENI headquarters in Abuja on Thursday (18/8/22).

According to Prof. Haruna, for any nation to offer permanent solutions to the issue of power supply, it must have its own High Voltage testing laboratory, which is what this project is expected to achieve for Nigeria, adding that, “NASENI had already trained since 2019 about 60 Engineers in these areas to ensure that when the plant effectively take off, it will be the best and will be run by trained Nigerian engineers and scientists”

“For any nation to have a steady power supply, it must have these three important projects, Solar cell production plant, High Voltage Testing Laboratory and Transformer Production Line. You cannot have a permanent and steady power supplies when you import all the components of electricity as currently obtained in Nigeria”. He added.

The EVC stated that NASENI is deliberately driving the project now in line with its mandate to provide capital goods and equipment including machinery in order to offer a solid foundation for the industrial development of the country. “We are in this for the purpose of ensuring that Nigeria becomes one of the countries in the world with steady power supply which is an essential foundation for a genuine industrialization dream by the country” he stressed.

Prof. Haruna also said that due to the importance which NASENI placed on solar energy, 98 NASENI engineers will soon be trained on Solar Cell Modular production in China. “The Engineers will leave by September this year. If we have the Solar Cell production plant in Nigeria, we will have steady light and even transmit to other African countries. The benefits of having local Solar Cell Manufacturing plant in the country are enormous”, said


Share:
Previous Article

NIDCOM MOVE TO PARTNER WITH TETFUND TO ...

Next Article

R&D: FG TO ADOPT EMERGING TRENDS TO ...

0
Shares
  • 0
  • +
  • 0
  • 0
  • 0
  • 0

Sam Ogbeifun

Related articles More from author

  • InnovationScienceTechnology

    PERMANENT SECRETARY SEEKS TECHNOLOGY EDUCATION FROM PRIMARY SCHOOLS

    April 12, 2025
    By Sam ogbeifun
  • EngineeringIndustryInnovationScienceTechnology

    Naseni ,Imose Launch made-in Nigeria Laptops and Tablets

    October 29, 2024
    By Sam ogbeifun
  • EducationInnovationTechnology

    Naseni & nmdc agree on economic diversification through rescucitation of mining & minerals development sector.

    February 20, 2022
    By Sam ogbeifun
  • InnovationTechnology

    VANDALISM : NCC URGES CONSUMERS TO PROTECT TELECOMM FACILITIES IN THEIR AREAS

    June 22, 2022
    By Sam ogbeifun
  • EngineeringInnovationScienceTechnology

    CLIMATE CHANGE RESPONSE: NASENI, GERMAN FIRM LAUNCH AND DISTRIBUTE 3000 UNITS OF SAVE 80 COOKING STOVES TO WOMEN, IDPS AND ...

    December 8, 2022
    By Sam Ogbeifun
  • EngineeringIndustryInnovationScienceTechnology

    NBRRI TO TIE A STRONG R&D COLLABORATION WITH SETRACO NIG. LTD & RITVALUE

    October 14, 2022
    By Sam Ogbeifun

Leave a reply Cancel reply

You may interested

  • InnovationScienceTechnology

    MEDICAL SCIENCE, TECHNOLOGY: FG SEEKS PARTNERSHIP WITH ACADEMY OF MEDICINE SPECIALTIES.

  • IndustryInnovationScienceTechnology

    RESEARCH INNOVATION: AUST CREATES ENTREPRENEURSHIP HUB, MOVES TO COMMERCIALIZE RESEARCH PRODUCTS

  • EngineeringScienceTechnology

    BUHARI APPOINTS ADAMU TUTUWA AS FIIRO BOSS.

Connect Us

  • Followers
  • Likes
  • Subscribers
  • Followers

Innovation Nigeria

NASENI NEWS

  • EngineeringIndustryInnovationScienceTechnology

    Renewable Energy: NASENI EVC visits Energy Industrial Park, assures of early completion

    Share:To address the nation’s energy deficit, the National Agency for Science and Engineering Infrastructure, (NASENI) has given a push for early completion of its Renewable Energy Industrial Park in Gora, ...
  • IndustryInnovationTechnology

    NASENI Chief Executive, Khalil Suleiman Halilu BagsYoung African Leader Award as African Leaders Gather in ...

    Share: The Executive Vice Chairman and CEO of the National Agency for Science and Engineering Infrastructure (NASENI), Mr. Khalil Suleiman Halilu, has called on African leaders to give priority attention ...
  • IndustryInnovationScienceTechnology

    CERTIFICATION: NASENI-TROMENT Biotechnology Factory Receives NAFDAC’s Inspection Officers

    Share:In bid to certify the NASENI-TROMENT Biotechnology factory for operation, the National Agency for Food and Drug Administration and Control (NAFDAC) has inspected the facility towards final licence approval for ...
  • EngineeringIndustryInnovationScienceTechnology

    Leadership Newspapers Named NASENI Environmental Impact Agency of year 2025

    Share:The National Agency for Science and Engineering Infrastructure (NASENI) under Mr Khalil Suleiman Halilu-Executive Vice Chairman/CEO was named the Environmental Impact Agency of the year 2025 at the 18th Edition ...

logo

An online news media promoting the culture of innovation, research and technology for national development.

Locate Us

  • Suite B10 .Emmanuel plaza,plot 228 P.O.W Mafemi Crescent Utako Abuja Utako, Nigeria 900108
  • +2349158263874
  • info@innovationnigeria.com.ng
  • Recent

  • Popular

  • Comments

  • Renewable Energy: NASENI EVC visits Energy Industrial Park, assures of early completion

    By Sam ogbeifun
    April 2, 2026
  • NASENI Chief Executive, Khalil Suleiman Halilu BagsYoung African Leader Award as African Leaders Gather in ...

    By Sam ogbeifun
    March 3, 2026
  • CERTIFICATION: NASENI-TROMENT Biotechnology Factory Receives NAFDAC’s Inspection Officers

    By Sam ogbeifun
    February 19, 2026
  • NASENI & INDONESIA REVIVE COLLABORATION ON TECHNOLOGY TRANSFER TO NIGERIA

    By Sam ogbeifun
    July 16, 2015
  • SEDI-Minna Targets New Production Systems To Manufacture Science Equipment for Schools

    By Sam ogbeifun
    January 31, 2022
  • New Nigeria Financial Law Affirms 0.25% Levy on Commercial Companies to Fund NASENI R&D’s

    By Sam ogbeifun
    January 9, 2022

Photostream

© Copyright Innovation Nigeira. All rights reserved.